site-smallerAt the end of January we laid out barrier fencing to show on site where the Hub will go. We were thrilled that our drawings on paper actually fitted where we thought they would on the ground! Over the following weeks the storms blew everything down, which was amazing.  I thought the holes in barrier fencing would prevent that.  Last week Priscilla Watkins, our Project Artist did this painting of the site, looking towards the church from the South West.  The foreground section with trees will be our toilet block.  Through the left hand gap between the trees you can see where our kitchen is planned. Somewhere at the far end will be our Hub entrance. The two yellow lines mark the walls of our strip of Upper Rooms in the roof space.  Click here to see a photo of the site from the other end.

Plans On Site

view from porch

Yesterday, Hendy and Richard laid out the plans for our building in mesh barrier fencing on site. This was done ahead of our site visit with the Diocesan Advisory Committee and others on Tuesday.

We’re glad to say that it all fits on the ground exactly as our drawings say it should!  Not a bad start for amateurs!

The yellow lines – in case you were wondering – mark where our “Upper Rooms” will fir in the roof space, as well as the internal wall of the toilet block.

Once the DAC give us a positive indication of openness to the scheme, we’ll be commissioning the surveys, professional design and drawings.

For some other views click below:

view from kitchen

view from toilets

view along the centre.

 

Church Council Agrees to Upper Rooms

cuttaway-3D

On Monday 2nd December Holy Trinity PCC agreed to expand our original plan to include a strip of Upper Rooms in
the roof space of the hall.  This is now seen as an absolutely necessary step in order to get permission for building. Without the extra Upper Rooms, the hall will only partially meet our needs. In short, we would still have to hire space beyond the church plant every week for our Children’s Provision.

Although providing for our own children’s ministry is only part of the vision, it is an important one – ongoing into the future. Our previous plan, which left only the hope of a second building was simply not secure enough.

Building rooms into the roof space will definitely be more expensive, but it will be much more cost-effective than a second building, and it will provide a much neater, more economic solution.  For more information, see Our Most Up-To-Date Plan

With this and other factors in mind, we have revised our fund-raising target to £380,000

STRAW BALE COMMUNITY BUILDING IN TULSE HILL

calling up pray-ersIt’s just beginning!

Although we’ve been working and praying towards this for nearly 40 years one way or another, we now feel that we’re on the brink of a wonderful venture. Of course we’ve felt like this before, but now we seem to have something that’s both attainable and “right”.

On October 21st 2013, the Church Council decided to move forward to the initial design phase, and on Sunday 27th October, our Project Team was commissioned in the morning service.